BuildTheNet

Opening your workspace

Your learning content and tools are loading.

Projects › Redundant Switching and Spanning Tree

Redundant Switching and Spanning Tree

Calloway Printworks lost a morning's production when a single uplink failed. Cable its three switches in a triangle so there is always a second path, run rapid PVST+, and decide which switch is root instead of letting the oldest one win.

Difficulty: intermediate · Time: about 50 minutes

Why it matters

Left alone, STP elects a root by the lowest MAC address, which is usually the oldest switch in the building. Choosing the root is the job.

Technologies

Related projects