Projects › Dual-Stack Collapsed-Core Campus with Per-VLAN Root Placement
Dual-Stack Collapsed-Core Campus with Per-VLAN Root Placement
An engineering firm is replacing a flat office network before its IPv6 rollout. The new design is a collapsed core: two core switches (CORE-01 and CORE-02, cross-linked) and two access switches, each access switch dual-homed to both cores. Everything is cabled and the hosts are addressed (IPv4 by hand, IPv6 set to autoconfigure); the switches are factory-fresh. This change window covers phase 1: VLANs, trunks, a deterministic spanning tree, and IPv4 and IPv6 gateways on CORE-01. Gateway redundancy across both cores is phase 2 (the HSRP project), so CORE-02 is the backup root but not yet a gateway.
Difficulty: intermediate · Time: about 75 minutes
Why it matters
Every campus starts here: VLANs that mean something, trunks that carry only what they should, and a root bridge that is placed rather than elected by accident. Getting IPv6 gateways into the first build, rather than bolting them on later, is how real refreshes stay on schedule.
Technologies
- VLANs
- 802.1Q Trunking
- Spanning Tree
- Root Bridge Placement
- Inter-VLAN Routing
- SVIs
- IPv4/IPv6 Dual-Stack
Related projects
- Campus Gateway High Availability with HSRPv2 and Uplink Tracking
- Campus Automation & Assurance Deployment via Catalyst Center
- Cross-Switch LACP EtherChannel & PortFast BPDU Guard
- Enterprise Wireless LAN with Catalyst 9800 WLC & FlexConnect
- Network Observability: Secure SNMPv3, Remote Syslog, and Flexible NetFlow
- IPv6-Only Multi-Area OSPFv3 for a Research Campus
- Capstone: Multi-Tier Global Enterprise Network Architecture
- Small Office DHCP with a Reserved Range for Printers and Servers