Routing-Capable Switch Network
Pemberton has doubled in size and the router-on-a-stick link is saturated every afternoon. Move inter-VLAN routing into a Layer 3 switch: switched virtual interfaces for each department, routed in hardware.
Difficulty: intermediate · Time: about 45 minutes
Why it matters
A router-on-a-stick trunk is a bottleneck and a single point of failure. Knowing when to move routing into the switch is a design decision, not a command.
Technologies
- SVIs
- Layer 3 Switching
- Inter-VLAN Routing
Related projects
- Dual-Stack Collapsed-Core Campus with Per-VLAN Root Placement
- Campus Gateway High Availability with HSRPv2 and Uplink Tracking
- Campus Automation & Assurance Deployment via Catalyst Center
- Cross-Switch LACP EtherChannel & PortFast BPDU Guard
- Enterprise Wireless LAN with Catalyst 9800 WLC & FlexConnect
- Network Observability: Secure SNMPv3, Remote Syslog, and Flexible NetFlow
- IPv6-Only Multi-Area OSPFv3 for a Research Campus
- Capstone: Multi-Tier Global Enterprise Network Architecture