BuildTheNet

Opening your workspace

Your learning content and tools are loading.

Projects › Routing-Capable Switch Network

Routing-Capable Switch Network

Pemberton has doubled in size and the router-on-a-stick link is saturated every afternoon. Move inter-VLAN routing into a Layer 3 switch: switched virtual interfaces for each department, routed in hardware.

Difficulty: intermediate · Time: about 45 minutes

Why it matters

A router-on-a-stick trunk is a bottleneck and a single point of failure. Knowing when to move routing into the switch is a design decision, not a command.

Technologies

Related projects