BuildTheNet

Opening your workspace

Your learning content and tools are loading.

Projects › Campus Core Redesign: From Layer 2 to a Routed Core

Campus Core Redesign: From Layer 2 to a Routed Core

A contractor cabled a new campus core (two core switches, two distribution switches and a data-centre distribution switch) and left every link as a default switchport. The result is one VLAN 1 loop that spanning tree resolves by blocking paid-for links, and a single gateway for everyone. The access layer is already trunked to both distribution switches. Rebuild the core as routed point-to-point links running OSPF, with redundant gateways at distribution, so losing any one core link costs a user no more than a couple of seconds.

Difficulty: advanced · Time: about 90 minutes

Why it matters

A routed core is the standard enterprise campus design because it removes spanning tree from the core: every link forwards, failures are detected as carrier loss and rerouted by the routing protocol in about a second instead of tens of seconds. The skill being tested is not typing `no switchport` but showing, per link, what a failure costs. Hiring managers value that kind of measured outcome.

Technologies

Related projects