BuildTheNet

Opening your workspace

Your learning content and tools are loading.

Projects › Redundant Campus Uplinks with STP Root Bridge Placement & PortFast

Redundant Campus Uplinks with STP Root Bridge Placement & PortFast

A financial analytics office suffered a network outage when a rogue switch was connected into a conference room, hijacking root bridge status. You must harden Spanning Tree across dual distribution switches by enforcing deterministic Root and Backup Root priorities and enabling edge PortFast with BPDU Guard.

Difficulty: intermediate · Time: about 40 minutes

Why it matters

Uncontrolled STP elections can push the root bridge onto an unmanaged access switch, causing suboptimal forwarding paths and network-wide broadcast loops.

Technologies

Related projects