BuildTheNet

Opening your workspace

Your learning content and tools are loading.

Projects › Final Capstone: Three Vendors, One Routed Path, End to End

Final Capstone: Three Vendors, One Routed Path, End to End

Linthorpe Councils share a service between two sites: Site A has a Cisco ISR (SITE-A-ISR, LAN 10.100.1.0/24), Site B an Arista 7050 (SITE-B-7050, LAN 10.100.2.0/24), and a shared-services Juniper SRX (TRANSIT-SRX) sits between them on 172.28.0.0/30 (A side) and 172.28.0.4/30 (B side). Nothing is configured, including the two PCs. Address every interface, route between the sites by any correct means, configure both hosts, and prove they reach each other. The lab SRX forwards in packet-based mode, so no zones are needed.

Difficulty: intermediate · Time: about 75 minutes

Why it matters

Everything in the multi-vendor track meets here: three syntaxes, routing in both directions and hosts that need gateways. There is no single new technique; the difficulty is that nothing forgives a mistake anywhere along the path, and finding the one hop that is wrong is the real skill.

Technologies

Related projects