Learning paths › CCNP Enterprise › First-hop redundancy, access control and switch services
First-hop redundancy, access control and switch services
The services an access layer leans on: DHCP served or relayed by the switch, a virtual gateway with HSRP, VRRP or GLBP that fails over on a tracked dependency, AAA separated into its three parts with the 802.1X roles around it, clock strata, SNMP, discovery protocols, a power budget and a mirrored port, stacking and a supervisor switchover — then the port-level controls lined up together: port security, storm control, DHCP snooping trust, and hosts isolated inside one subnet.
Lessons
- Decide whether a bundle switches or routes
- Hand hosts a virtual gateway that survives failover
- Fail over on a tracked dependency with preempt
- Use a standard first-hop redundancy protocol across vendors
- Share gateway load across several virtual forwarders
- Put supplicant, authenticator and server in their roles
- Poll an OID and receive a trap
- Budget power from the switch to the device
- Mirror the right direction to an analyser
- Schedule a probe and read its results
- Manage several switches as one logical system
- Join two chassis under one control plane
- Keep forwarding through a supervisor switchover
- Line up the port controls before configuring them
- Limit which MAC addresses a port accepts
- Cap broadcast and multicast before it floods
- Trust only the server-facing path for DHCP
- Stop switch spoofing on an access port
- Isolate hosts that share one subnet
More in CCNP Enterprise
- Enterprise design and switching
- Topology protection and routing
- Routing policy and isolation
- Services, assurance and automation
- ENARSI — Advanced Routing and Services
- Catalyst SD-WAN — Overlay and Controller Operations
- Routing: EIGRP, OSPF and redistribution
- Internet edge, BGP and overlay transport
- Maintenance, switching and spanning tree
- Wireless, multicast, automation and SD-Access
- Quality of service and what an outage costs