BuildTheNet

Opening your workspace

Your learning content and tools are loading.

Projects › Pre/Post Change Verification with Automatic Rollback

Pre/Post Change Verification with Automatic Rollback

Change CHG-2291 adds a monitoring loopback to each of three core routers and advertises it in OSPF. Automate the change the safe way: capture pre-change state, apply each router's change file, capture post-change state, and if a router lost an OSPF neighbour, apply its rollback file automatically. Report the outcome per router.

Difficulty: advanced · Time: about 60 minutes

Why it matters

Pre and post checks with an automatic rollback are what let a team run changes in a maintenance window with confidence. One of these change files has a mistake in it — the job is to catch it from evidence, not to spot it by eye.

Technologies

Related projects