BuildTheNet

Opening your workspace

Your learning content and tools are loading.

Projects › VLAN Rollout to Access Switches from a CSV

VLAN Rollout to Access Switches from a CSV

The floor refresh needs four new VLANs on every access switch. Drive the change from data: read the switch list from inventory.csv and the VLANs from vlans.csv, push them with Netmiko, save each switch, and write a per-switch rollout report. The distribution switch is out of scope for this change.

Difficulty: foundation · Time: about 35 minutes

Why it matters

Pushing the same change to many devices from a data file is the bread and butter of network automation — and the place mistakes multiply. Scoping by role, correcting what is already there, and saving the result are what make a rollout safe to run twice.

Technologies

Related projects